What this work involves
Have the installer assess the available supply, cable route, mounting position and interaction with other equipment.
- Position and cable route
- Load management and use
- Controls and cost allocation
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Coordinate cooling, ventilation and controls with assessed room requirements.
Decide this before construction
Discuss glazing, shading and ventilation before finalising facade or roof openings. Coordinate required service routes before closing internal finishes.
Allow for later maintenance
Keep operating instructions and maintenance agreements for the different systems together. Record where filters and inspection points must remain accessible.
Cost factors for this service
Costs depend on connection work, excavation, charge point and electrical upgrades. Ask for the scope and selected specification to be described separately.
Bring this to the discussion
Photographs of the existing situation, available drawings and your requirements for ev charge points. Identify the elements that should remain.
Questions about the work
What should I discuss before arranging ev charge points?
Shared parking also requires clarity about permission, management and cost allocation. These arrangements must suit the actual location.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.

