A clear budget starts with clear scope.
The cost follows from the existing building and the agreed work.

Compare the complete intervention
Compare the complete comfort solution, including controls and maintenance. A lower glazing price says little if it creates a need for other measures or adaptations.
Which trade-off matters?
More glazing does not automatically call for active cooling. Compare window size, shading and use first, then assess which technical provisions are appropriate.
What belongs in the budget?
- Survey, investigations and design preparation.
- Demolition, foundations, structure and new building elements.
- Electrical, water, heating and ventilation work.
- Windows, floors, walls, kitchens and bathrooms.
- Access, protection, scaffolding and waste removal.
- Clearly identified provisional sums and change arrangements.
A starting price needs a defined scope.
Ask for work, materials, VAT, assumptions and provisional sums to be clearly described. Undecided items should remain visible so an early estimate is not mistaken for a fully developed final budget.
Compare the content
Consider preparation, protection, timing and reinstatement alongside the total price.
Read the quote comparison guide