What this work involves
Place furniture and work areas on the drawings and discuss glare, controls and maintenance before ceilings are closed.
- Fittings and light distribution
- Switching and dimming
- Installation space and access
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Coordinate cooling, ventilation and controls with assessed room requirements.
Decide this before construction
Discuss glazing, shading and ventilation before finalising facade or roof openings. Coordinate required service routes before closing internal finishes.
Allow for later maintenance
Keep operating instructions and maintenance agreements for the different systems together. Record where filters and inspection points must remain accessible.
Cost factors for this service
Costs depend on number of fittings, cabling, controls and ceiling work. Ask for the scope and selected specification to be described separately.
Bring this to the discussion
Photographs of the existing situation, available drawings and your requirements for lighting design & installation. Identify the elements that should remain.
Questions about the work
What should I discuss before arranging lighting design & installation?
Check compatibility between fittings, light sources and dimmers. A trial arrangement can help with colour and ambience choices.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.

